Wet Weather Sampling Results for:

Sampling Location 725-2 Lorraine Storm Branch #1


Sample ID Date Level (feet) Color Clarity Odor Ammonia (ppm) Surfactants (ppm) Cond. (µS/cm) Temp. (°C) E. coli (colonies/100mL)
725-2-12 9/19/2001 0.120 colorless slightly turbid none 1.5 1.5 352 16.6 529
725-2-13 9/19/2001 0.290 colorless clear none 1.0 1.0 1305 16.4 1,669
725-2-14 9/19/2001 0.339 colorless slightly turbid none 0.8 1.5 230 16.5 19,863
725-2-15 9/19/2001 0.447 colorless clear none 1.0 1.0 111 16.7  
725-2-16 9/19/2001 0.302 colorless clear none 0.8 0.25 138 15.9  
725-2-17 9/19/2001 0.229 colorless clear none 0.8 0.25 1444 16.1 8,664
725-2-18 9/19/2001 0.205 colorless clear none 0.6 0.25 155 16.0  
725-2-19 9/19/2001 0.250 colorless clear none 0.6 0.25 147 16.4  
725-2-20 9/19/2001 0.284 colorless clear none 0.6 0.00 128 16.3  
725-2-21 9/19/2001 0.229 colorless clear none 0.4 0.25 143 16.4  
725-2-22 9/19/2001 0.217 colorless clear none 0.4 0.25 172 16.5  
725-2-23 9/19/2001 0.230 colorless clear none 0.6 0.00 142 16.6 4,884
725-2-24 9/19/2001 0.212 colorless clear none 0.6 0.25 137 16.7  

Note: Samples 1-11 were collected for an earlier non-qualifying wet weather event and therefore not analyzed.

This web site has been developed by the Drain Board for the Bear Creek Clean Water Initiative. Questions about the project can be directed to Lynne Seymour, Environmental Engineer, Office of Macomb County Public Works Commissioner, (586) 469-5910.

Sediment Sampling
What is sediment sampling

Locations
Results

Sediment

Dry Weather Open Drain

Dry Weather Enclosed Drain

Wet Weather

Dry Weather Open Drain Sampling
Explain dry weather open drain sampling

Outfalls
Results

Dry Weather Enclosed Drain Sampling
Explain dry weather enclosed drain sampling.

Bear Creek Inter-County Drainage District
Outlets
Results

Wet Weather Sampling
Explain wet weather sampling.

Locations
Results
Follow-up Sampling and Investigations
Explain follow-up sampling and investigations.

Results

Corrective Action
Explain corrective action.

Corrective Action Notice

Final Verification Sampling
What is final verification sampling.

Locations
Results

Project Status Reports
Explain project status reports

May 2001
June 2001